2019


THEY WROTE ABOUT US

2019

DATE: 06. 12. 2019

Project PPP D4R7, 8a, DZSD, DSP, DRS, DSVS, IC, coordination activity

D4R7 PPP – Dual Carriageway R7, Dunajska Luzna – Holice, DRS, DSRS, MPV

D4R7 PPP – Dual Carriageway R7, Bratislava – Dunajska Luzna, DRS, DSRS, MPV

Highway D1 Turany – Hubova, technical solution update, DSZ, DUR, IGHP, MPV, IC

Highway D1 Hubova – Ivachnova, DZSD, DRS

Highway D1 Budimir – Bidovce, DVP, DSRS, IC

Highway D1 Hricovske Podhradie – Lietavska Lucka, DRS, DSRS, IC

Highway D3 Oscadnica – Cadca, Bukov, 2nd profile; DSP, DRS

Highway D3 Zilina (Brodno) – Kysucke Nove Mesto, DUR

Dual Carriageway R1 Banska Bystrica – Slovenska Lupca, DSP

Roznava – Jablonov nad Turnou Dual Carriageway, DSP, DP (DRS)

Dual Carriageway R2 Moldava nad Bodvou – Saca, DUR, DSZ

Dual Carriageway R3 Krupina, bypass, DSZ, DUR

Dual Carriageway R4 Presov – North bypass (km 0.0-4.3) 1st stage, DVP, DSRS

Dual Carriageway R7 Dolny Bar – Zemne, DUR

Dual Carriageway R7 Zemne – Nove Zamky, DUR

Modification of the roundabout with a connection to D4 Dual Carriageway and circular access road to Devinska Nova Ves zone, DUR

Development concept for placement of and equipment of rest areas on highways and dual carriageways in Slovakia, KS

Modernization of selected sections of first category roads in TT and NR regions for the construction of I/13 Velky Meder – Cilizska Radvan, DSP/DRS, DP

Modernization of selected sections of first category roads in TT and NR region I/13 Velky Meder – Cilizska Radvan, bridges 13-001,13-002, DSP/DRS, DP

Reconstruction of junctions on first category roads. 3rd stage in TT region, I/13 and III/1407 IZOP, DSP/DRS, DP

Reconstruction of junctions on first category roads. 3rd stage in TT region, /13 and I/63 Velky Meder, DSP/DRS, DP

I/44 Bludov – bypass, VD ZDS

Elaboration of construction documentation (RDS) and documentation of actual construction (DSVS): D35 Opatovice – Casy, RDS

I/67, I/66, I/77 Roznava – Bardejov Spa, SR

I/68 Kremna landslide, DSZ, DUR

I/68 Sabinov, relocation of road, DSP update

III/3622 Vranov nad Toplou – northwestern bypass with a connection to I/18, TS

Preparation of road infrastructure – strategic park Nitra, DRS, DSRS, IC

New bridge across the Danube between Komarno and Komarom, DVP, DSRS

New road bridge over the Danube between Komarno – Komarom, access road, DVP, DSRS

Unified Traffic Control Center on Domkarska Street in Bratislava, DUR, DSP, DP

Rest area Rovinka, DRS

Reconstruction of the railway station Vsetin, DRS

Extension of a diagnostic center and construction of a pavilion of Children’s Cardio Center Bratislava, TD, IC

Reconstruction of the National Cultural Monument in Rusovce I. Part – reconstruction of the manor house Rusovce including the adjacent area, IC

Reconstruction of the national cultural monument in Rusovce II. Part – Reconstruction of Servant Quarters, including historical gardens and the park in Rusovce, IC

Highway D3 Zilina (Strazov) – Zilina (Brodno), IC

Highway D3 Kysucke Nove Mesto – Oscadnica, MPV

Highway D1 Lietavska Lucka – Visnove – Dubna Skala, IC, MPV

Highway D1 Fricovce – Svinia, SD

Highway D1 Budimir – Bidovce, SD

Highway D1 Dubna Skala –Turany, SD

Highway D1 Hricovske Podhradie – Lietavska Lucka, SD, IC

Highway D3 Svrcinovec – Skalite, SD, IC

Innovation and modernization of lock chambers to increase safety and intensity of water transport through the Gabcikovo Dam, STD


DOWNLOAD